Process automation and integration
APS, FMS and custom solutions matched to material flow and production cycle time.

Process mapping
Workpiece input, positioning, operations, inspection and output.
Integration scope
Feeders, handling, APS, interfaces, safety and data.
Phased implementation
The option to start with a workstation and expand later.
Acceptance
FAT/SAT criteria, cycle time, quality, availability and documentation.
What should you prepare?
- workpiece family, volume and production mix
- required cycle time, OEE or other performance measures
- processes before and after the T-DRILL operation
- layout, handling and material feeding method
- safety, traceability and IT requirements
- changeover requirements and FAT/SAT criteria
Outcome
A production flow concept, integration scope, automation phases, FAT/SAT measures and the next step towards a budgetary or final system configuration.
Have a process to automate?
Share your part family, target cycle time, layout and the operations before and after T-DRILL. We will start with the process flow and integration scope.
