Factory Acceptance Testing (FAT) checks the agreed machine functions and scope before shipment. Site Acceptance Testing (SAT) checks installation and operation after delivery to the customer’s facility.

Before FAT

  • Agree the acceptance criteria.
  • Prepare the trial material and sample workpieces.
  • Confirm the programmes, tooling and options included.
  • Agree how results will be recorded and reviewed.

Before SAT

  • Prepare utilities and any required foundations to the installation specification.
  • Arrange unloading and internal transport.
  • Make operators and responsible site personnel available.
  • Prepare test material and any required network or IT access.
  • Confirm site safety arrangements and responsibilities.

Treat acceptance as a preparation process, with defined inputs and owners, rather than a single day of testing.