Cycle time, repeatability and fewer operations between workstations
In series production, stable flow is essential: cutting, forming, inspection and workpiece transfer with fewer handling operations.

Typical applications
- tubes for fluid and thermal systems
- components requiring formed ends
- chip-free cut lengths with reduced cleaning needs
- high-output automated production cells
What do we assess?
We assess tolerances, cycle time, OEE, traceability, product changeovers, quality control and automation interfaces.
Possible process elements
TCC
Chipless tube cutting for series production.
End forming
Expanding, reducing, grooving and shaping tube ends.
Collaring
Outlets where geometry and material allow a simpler component design.
FMS / integration
Feeding, positioning, inspection and communication with the production line.
Compare your current line cycle time
Send the material, diameter and wall thickness, part lengths, cycle time/OEE, tolerances, volume and operations before and after tube processing.
